Improving the NSW bike network image The following projects are council based and details are available by contacting the relevant council:
Albury - construction of a shared path bridge along the southern side of the Riverina Highway over the creek 250 metres east of Phoenix Place, Thurgoona.
Coolamon - construction of a shared path along the south side of Loughnan Street from Mirrool Street to Cowabbie Street, Coolamon.
Coolamon - construction of a shared path along the north side of Mann Street from Mirrool Street to Mimosa Street, Coolamon.
Coolamon - construction of a shared path along the eastern side of Mithul Street from Ariah Street to Barellan Street, Ardlethan.
Cootamundra - construction of concrete culvert extensions, on both sides of Temora Street (Stockinbingal Road (MR235)) at the existing Muttama Creek culvert, to provide continuous road shoulders from McGowan Street to Boundary Road, Cootamundra
Corowa - construction of a spray sealed shared path along the northern side of Victoria Street from Larmer Street to East Street, Howlong.
Deniliquin - construction of a (boardwalk) shared path along the southwestern side of the Edward River from the National Bridge (Davidson Street (Cobb Highway)) to the wharf at Edwardes Street, Deniliquin.
Griffith - construction of a shared path along the northern side of Wakaden Street from Macarthur Street to Blumer Avenue, Griffith.
Harden - construction of a shared path along the northern side of Albury Street (MR84) from Bathurst Street to Lyons Street, Murrumburrah.
Hay - construction of a shared path along:
- The eastern side of Palmer Street - Lang Street to Russell Street.
- The southern side of Russell Street from Palmer Street to 100 metres east of Archer Street, South Hay.
Jerilderie - construction of a shared path along the southern side of Jerilderie Street (Newell Highway) from Brown Street to Betts Street, Jerilderie.
Junee - Stage 1 - construction of a shared path along the northern side of the Olympic Highway road reserve from the western side of the drainage reserve (23/1025451) to Monte Cristo Road, Junee.
Leeton - construction of a shared path through Enticknap Park and the central median of Melaleuca Avenue from Railway Avenue to Lilac Avenue, Leeton.
Murray - construction of a shared path along the western side of Twenty Four Lane from Mayfield Court to Tatalia Road , Moama.
Murray - construction of a shared path along the northern side of Picnic Point Road from the Gulpa Creek Reed Beds Bird Hide (Sandhill) eastwards for 1000 metres, Mathoura.
Temora - reconstruction of the "Lake Centenary" shared path from Kitchener Road to Lake Centenary, Temora.
Urana - construction of a shared path along 1) the southern side of Milthorpe Street from Coreen Street to Hunter Street; and 2) the eastern side of Hunter Street from Milthorpe Street to Buller Street, Oaklands.
Wagga Wagga - construction of a shared path along the eastern side of Kooringal Road from the Wagga Wagga Christian College to Vincent Road, Wagga Wagga.
Wakool - of a shared path along Punt Road from Hudson Boulevarde to Wakool Street, Barham.
Yass Valley - construction of a shared path along the western side of Waroo Road from Cobham Street to roundabout on Grand Junction Road, Yass.
Yass Valley - construction of a shared path along the western side of Grand Junction Road from Waroo Road to Perry Street, Yass.